"Rough-in inspection passed, plasterers are booked."
The first pass of a service trade, done once the frame is up and before the plaster goes on. The sparky runs cables, the plumber runs pipes, the aircon crew runs ducts. Everything is left poking out of the frame to be finished later. Sometimes written rough in or roughing in.
Common questions about rough-in
Yes, but it costs. Once plaster is on, moving a point means cutting and patching. Walk the frame with your sparky before rough-in and mark every point with tape. Most builders allow an electrical walk-through for exactly this reason.
BuildPilot is an independent Australian building platform, we publish guidance, we don't hold a building licence. Every Australian residential build must comply with the National Construction Code plus state-specific Acts and consumer-protection law. The authorities below are the primary sources of truth for the rules that actually apply to your project.
The primary national set of technical building standards that every Australian build must comply with. Volume 2 covers Class 1 & 10 buildings (most homes).
Specific material, product and method standards (e.g. AS 3700 masonry, AS 1684 timber framing) referenced by the NCC.
National peak body for residential builders. Publishes the most widely used home-building contracts and consumer guidance.
National peak body for general builders. Publishes commercial and residential contracts and industry guidance.
Links above open the public website of each authority. BuildPilot is not affiliated with these bodies and does not act on their behalf. Information on this page is general - check the current edition of the NCC and the relevant state Act for binding requirements.
We use cookies to improve your experience. Cookies on. Learn more