New Home Fit Out Guide

Fitting Out a New Home, Room by Room

The finishing stage of any build is turning the shell into a home. Here is the room-by-room checklist - what to buy, the order to buy it in, and the product decisions (security, backup power, windows) that are far cheaper to make while the walls are still open.

George Giannakakis, Founder, BuildPilot
By George Giannakakis · Founder
B.Arch.Studies · M.Arch (UniSA) · RLA300580 · Reviewed
See matched products
Quick answer

The finishing stage of any build is turning the shell into a home. Here is the room-by-room checklist - what to buy, the order to buy it in, and the product decisions (security, backup power, windows) that are far cheaper to make while the walls are still open.

The 10-step framework

  1. STEP 1

    Plan the finishing layer before handover

    The fit-out is the last 10-15% of a build, but it is where a house becomes a home - and where budgets blow out if you leave it to the week you move in. List every room, decide what is fixed by the builder versus what you supply, and set a rough budget per space. Buy the big, slow pieces first (lounges and beds can be 6-10 weeks made-to-order) and leave decor until last. Anything that touches cabling, power or plumbing - security, backup power, data, extra points - is far cheaper to decide while the walls are still open, so make those calls before lock-up.

  2. STEP 2

    Kitchen and dining

    If your contract includes the kitchen cabinetry and benchtop, your fit-out job is the loose layer: a dining table and chairs sized to the space, cookware matched to your cooktop (induction needs magnetic bases), everyday dinnerware and glassware, and bar stools if you have an island. For a renovation or a custom build where you are choosing the benchtop, sink and tapware yourself, lock those in early - they set the look and the plumbing rough-in.

  3. STEP 3

    Bathroom and laundry

    In a new build the builder usually installs the vanity, shower, toilet and tapware to your selections, so confirm those selections against your PC (prime cost) allowances before the fit-off stage. Your supplied layer is the finishing kit - mirrors, shaving cabinets, towel rails, a laundry hamper and storage. If you are renovating, you choose the full fixture set yourself, so plan the layout first since moving plumbing is the most expensive change.

  4. STEP 4

    Living and family zones

    Start with the sofa - measure the room and the doorways it has to travel through, and tape the footprint on the floor before you fall in love with a size that will not fit. Add a rug large enough that at least the front legs of every seat sit on it, then layer lighting (ambient, task and accent) and the media and storage pieces. This is the room guests see first, so it is worth spending here and saving on rooms used less.

  5. STEP 5

    Bedrooms and sleep

    Match mattress firmness to how you sleep - side sleepers want medium to medium-soft, back and stomach sleepers firmer - and check the bed base and frame height suit the mattress depth. Add bedside tables, wardrobes or storage if they are not built in, and natural-fibre bedding that breathes. A good online mattress usually comes with a 100-night trial and a 10-year-plus warranty, so use the trial to confirm comfort.

  6. STEP 6

    Dress the windows

    Window furnishings are one of the most-forgotten fit-out lines and one of the biggest for privacy, light control and warmth. Blockout curtains or blinds suit bedrooms, media rooms and west-facing glass; sheers give daytime privacy while keeping rooms bright; layering a sheer behind a blockout gives you both. Measure early - ready-made ranges come in set drops - and decide eyelet versus pinch pleat, and rod versus track, per room.

  7. STEP 7

    Floors and keeping them clean

    Rugs define zones and soften hard floors; runners protect high-traffic hallways. New tiles, timber and vinyl each want different care, so get the right mop or a cordless hard-floor cleaner rather than soaking a timber floor. A robot vacuum handles daily upkeep on hard floors while a cordless stick covers stairs, cars and a deeper weekly clean - many new homes run both.

  8. STEP 8

    Outdoor and alfresco

    If your build includes an alfresco or you are adding a deck, pergola or verandah, the outdoor room needs furniture that handles the Australian climate - powder-coated aluminium, all-weather wicker or oiled teak - sized with at least 90cm of clearance around a dining setting. Add shade for summer and a heater or fire pit to stretch the cooler months, plus outdoor lighting so the space works after dark.

  9. STEP 9

    Design energy and backup power in early

    A modern home's energy layer - solar, a home battery and portable backup power - is cheapest to plan while the build is still open. Even if you fit a portable power station or expansion battery after you move in, deciding where it lives, what circuits matter in a blackout, and leaving room in the switchboard saves rework. Backup power keeps the fridge, internet and a few lights running through an outage and can shave expensive peak-tariff usage.

  10. STEP 10

    Plan home security before lock-up

    Security is the clearest example of a product decision that belongs in the build, not after it. Fully wired cameras and a video doorbell are far easier to run while the walls are open, so decide camera positions, power and data runs before lock-up even if you install battery cameras in the short term. Cover the entries first - front door and driveway - then expand to the backyard and side gates, and check your Wi-Fi or mesh reaches the far corners.

4 must-know terms to learn before searching for a home design
23m 57s
Watch: same topic on Home Building HubSponsored byHome Building Hub
4 must-know terms to learn before searching for a home design

Navigating home designs can be confusing with all the industry jargon. In this episode we break down four essential terms - design ranges, lot dimensions, house sizes, and pricing - to simplify your journey. Learn how to interpret builder websites and make informed decisions for your dream home.

Watch full episode

FAQs

Start planning the fit-out well before handover. Order the big, slow pieces first - made-to-order lounges, dining sets and beds can take 6-10 weeks - and leave decor until last. Crucially, any product that touches cabling, power or plumbing (security cameras, backup power, extra data or power points) should be decided before lock-up, because it is far cheaper to run while the walls are open than to retrofit later.