
By George Giannakakis · B.Arch.Studies · M.Arch (UniSA) · RLA300580
Last reviewed: · How we research
"Plumby has to do his under-slab before the concreters pour."
A plumber. Less common than sparky or chippy, but you will hear it. Plumbers do the drainage under the slab, the rough-in of water and gas through the frame, and the fit-off of taps, toilets and hot water at the end.


Just weeks away from handover? Before you sign anything, learn how to identify genuine defects, understand what's considered "within tolerance," and make the most of your leverage before final payment. Whether you hire an independent inspector or do your own walkthrough, this episode will help you approach your PCI with confidence.
Watch full episodeBuildPilot is an independent Australian building platform, we publish guidance, we don't hold a building licence. Every Australian residential build must comply with the National Construction Code plus state-specific Acts and consumer-protection law. The authorities below are the primary sources of truth for the rules that actually apply to your project.
The primary national set of technical building standards that every Australian build must comply with. Volume 2 covers Class 1 & 10 buildings (most homes).
Specific material, product and method standards (e.g. AS 3700 masonry, AS 1684 timber framing) referenced by the NCC.
National peak body for residential builders. Publishes the most widely used home-building contracts and consumer guidance.
National peak body for general builders. Publishes commercial and residential contracts and industry guidance.
Links above open the public website of each authority. BuildPilot is not affiliated with these bodies and does not act on their behalf. Information on this page is general - check the current edition of the NCC and the relevant state Act for binding requirements.
We use cookies to improve your experience. Cookies on. Learn more