"Frame-up invoice is due once the inspector signs off the bracing."
The point when the timber or steel frame is standing and braced. "Frame-up" or "frame stage" is a progress payment stage in most building contracts, usually 15-20% of the contract price. It is also the moment the house suddenly looks real.


Getting your budget right is the first real step in the building journey - but most people don’t know where to start. In this episode, we break down the full process of setting your game plan, from confirming your finance capacity to comparing quotes, and share a free Google Sheets budgeting template to help you stay on track from day one.
Watch full episodeBuildPilot is an independent Australian building platform, we publish guidance, we don't hold a building licence. Every Australian residential build must comply with the National Construction Code plus state-specific Acts and consumer-protection law. The authorities below are the primary sources of truth for the rules that actually apply to your project.
The primary national set of technical building standards that every Australian build must comply with. Volume 2 covers Class 1 & 10 buildings (most homes).
Specific material, product and method standards (e.g. AS 3700 masonry, AS 1684 timber framing) referenced by the NCC.
National peak body for residential builders. Publishes the most widely used home-building contracts and consumer guidance.
National peak body for general builders. Publishes commercial and residential contracts and industry guidance.
Links above open the public website of each authority. BuildPilot is not affiliated with these bodies and does not act on their behalf. Information on this page is general - check the current edition of the NCC and the relevant state Act for binding requirements.
We use cookies to improve your experience. Cookies on. Learn more