
By George Giannakakis · B.Arch.Studies · M.Arch (UniSA) · RLA300580
Last reviewed: · How we research
"Concretor has the pour booked for 5am before it gets hot."
The trade that forms and pours the slab, driveway, paths and footings. Australians say concretor, not concreter, on site. A concretor will talk about the pour, the screed, the trowel finish and "bleeding" (water rising to the surface).

Today we talk about the main regulation changes related to energy rating and livable housing, proposed to be coming in 2023 (well, at the time of recording this). Using the information that is available to date, we explain the reasons for the changes, the benefits of the changes, and most notably the significant price impact and design impact that these changes will have on buyers after the regulations are implemented.
Watch full episodeBuildPilot is an independent Australian building platform, we publish guidance, we don't hold a building licence. Every Australian residential build must comply with the National Construction Code plus state-specific Acts and consumer-protection law. The authorities below are the primary sources of truth for the rules that actually apply to your project.
The primary national set of technical building standards that every Australian build must comply with. Volume 2 covers Class 1 & 10 buildings (most homes).
Specific material, product and method standards (e.g. AS 3700 masonry, AS 1684 timber framing) referenced by the NCC.
National peak body for residential builders. Publishes the most widely used home-building contracts and consumer guidance.
National peak body for general builders. Publishes commercial and residential contracts and industry guidance.
Links above open the public website of each authority. BuildPilot is not affiliated with these bodies and does not act on their behalf. Information on this page is general - check the current edition of the NCC and the relevant state Act for binding requirements.
We use cookies to improve your experience. Cookies on. Learn more