The PlanSA process explained in plain English - what you lodge, in what order, and where builds actually get held up.

By George Giannakakis · B.Arch.Studies · M.Arch (UniSA) · RLA300580
Last reviewed: · How we research
Assesses your proposed design against the Planning and Design Code plus your council's specific policies. Lodged through the PlanSA portal. Assessment time: 4-16 weeks depending on council and overlays. Complexity drivers: Character Area, Historic Area, Heritage Place listings, Bushfire Prone Area, Coastal Overlay, Regulated Tree, and Public Notification triggers.
Assesses your design against the National Construction Code (formerly BCA). Focuses on structure, fire safety, energy efficiency, accessibility and health. Can be issued by council or a private certifier. Typical fee: $521 or 0.25% of build cost for a Class 1 dwelling. Assessment: 2-4 weeks once documents are complete.
Development Approval = Planning Consent + Building Rules Consent + any conditions. Once issued, construction can commence. You must appoint a certifier (council or private) to inspect key stages: footings, slab, frame, wet area waterproofing, and final. Missing inspections voids the approval.
Issued at the end of the build once the certifier confirms all inspections passed and the build matches the approved plans. You cannot legally occupy the dwelling until this cert is on file. Some builders arrange a 2-4 week "practical completion" window - you cannot move in during it.
Standard metro Class 1 dwelling: 4-8 weeks combined Planning + Building Rules Consent. Character or heritage overlay area (Prospect, Burnside, Charles Sturt inner suburbs, Norwood): 12-20 weeks. Bushfire-prone hills lot: add 2-4 weeks. See our per-council guides for accurate timelines.
Public Notification is when your neighbours get 15 business days to formally object to your development. Triggered for most dual-occupancy, subdivision, character-area builds, and any design that deviates from a policy. It adds 3-6 weeks and neighbour objections can force design changes.
Yes. All granny flats in SA require Planning Consent + Building Rules Consent regardless of size. Since the 2023 rule change, granny flats can be rented separately from the main dwelling but the approval process is unchanged. Budget 6-12 weeks approval time.
Any development on a State Heritage Place, Local Heritage Place, or (often) a lot adjacent to a heritage-listed dwelling. Council may request one at RFI stage even without a formal listing. Cost: $1,500-$3,500 for an accredited heritage consultant. Add 3-6 weeks.