1. Work with the slope, not against it
The first principle of split-level design is to match the floor levels to the natural slope of the block. A moderate slope of 1 metre over 15 to 20 metres of block length can typically be handled with two or three floor levels, each half or one flight of stairs above or below the next.
This minimises the amount of cut and fill required at site preparation. Cut and fill is expensive: every cubic metre of soil moved has a cost, and imported fill or exported spoil compound this.
The alternative (a fully level slab requiring significant cut on the high side and fill on the low side) is common on volume home builds but often produces the highest site work costs and the largest retaining wall requirements. Split-level design avoids both.