Bathroom Renovations Melbourne

Independent Melbourne Guide

Bathroom Renovations Melbourne

Real 2026 Melbourne bathroom pricing, the sub-floor waterproofing that catches Edwardian and Victorian owners out, and how to spec a bathroom that survives 25 years.

George Giannakakis

By George Giannakakis · B.Arch.Studies · M.Arch (UniSA) · RLA300580

Last reviewed: · How we research

Melbourne bathroom renovations face three heavy realities: waterproofing suspended timber sub-floors in Edwardian and Victorian homes (a $6k-$14k premium), asbestos removal in pre-1985 bathrooms (very common in Melbourne), and premium trade rates in inner suburbs. This guide covers real costs and the waterproofing decisions that determine whether a bathroom lasts 8 or 25 years.

Real all-in cost by scope

Budget bathroom (re-tile, new vanity + toilet + shower screen, keep footprint): $18,000-$32,000. Mid-range full bathroom (new plumbing, floor-to-ceiling tiles, quality tapware, custom vanity): $38,000-$58,000. Premium (stone finishes, freestanding bath, heated floors, architect design): $65,000-$120,000+. Add 10-25% for heritage suburbs. Add $2,500-$8,500 for asbestos removal (pre-1985 bathrooms).

The sub-floor waterproofing challenge

Pre-1940 Melbourne homes typically have suspended timber sub-floors. Modern falls (1:80 minimum), membranes and drainage all need to be retro-fitted. Budget $6,000-$14,000 extra vs a modern slab-on-ground home. Poor waterproofing is the #1 cause of $20k+ warranty claims 5-10 years post-renovation. Insist on a certified waterproofer with a written 10-year guarantee.

Asbestos in pre-1985 bathrooms

Bathrooms built between 1955 and 1985 in Melbourne almost always contain asbestos - eaves, wall sheeting, ceiling boards, floor vinyl backing. Full removal + safe disposal adds $2,500-$8,500 to any full-strip renovation. Get a licensed asbestos assessor + certified removal contractor before demolition. Under Victoria's OHS regulations, DIY removal of more than 10m² is illegal.

The six questions every Melbourne bathroom renovator must answer

1. Show me your current VBA registration + DBI cert. 2. What is the fixed price - and what triggers a variation? 3. Who is the certified waterproofer + what warranty do they provide? 4. What happens if hidden asbestos is discovered? 5. Give me three recent bathrooms I can visit + one customer I can call. 6. How long will my bathroom be unusable?

Frequently asked questions

On-site: 4-8 weeks for full renovation. Design + selections: 4-8 weeks. Total from decision to using the new bathroom: 3-6 months. Add 2-4 weeks in heritage/character suburbs.

We are opening in Victoria

Get matched with vetted Melbourne specialists.

BuildPilot is preparing to open in Victoria. Join the waitlist and we will contact you first when the Melbourne matcher goes live.

Related Melbourne guides

Building in South Australia? See the Adelaide version of this guide →

Disclaimer: Pricing ranges are Mar 2026 Melbourne market observations and indicative only. Actual costs depend on site conditions, block access, materials and finish level. BuildPilot is an independent home-build CoPilot and does not build or supply. Always obtain three fixed-price quotes on identical inclusions, verify Victorian building licences via Victorian Building Authority and check planning overlays via VicPlan.