Your Melbourne inner north-west council approval guide
Moonee Valley City Council covers Melbourne's inner north-west, Moonee Ponds, Essendon, Ascot Vale, Aberfeldie, Airport West, Avondale Heights, Niddrie and Strathmore. It is an established, knockdown-rebuild and renovation market with strong heritage and neighbourhood character controls through the older suburbs, and activity-centre built-form controls around Moonee Ponds.
Heritage + character homes
Essendon, Moonee Ponds and Ascot Vale carry extensive Heritage Overlay and neighbourhood character controls; front alterations and demolition of period homes usually need a planning permit.
Moonee Ponds activity centre
Built-form, height and overlooking controls apply around the Moonee Ponds activity centre; multi-dwelling and apartment projects face discretionary assessment.
Flooding near the Maribyrnong
Low-lying land near the Maribyrnong River can carry a Land Subject to Inundation or floodway overlay; check VicPlan early as this affects floor levels and permits.
Victoria separates planning permits (about land use, from your council) and building permits (about construction methods, from a Relevant Building Surveyor). You usually need the planning permit FIRST, then the building permit.
Check zoning + overlays
Use VicPlan (planning-schemes.app.planning.vic.gov.au) or your council's interactive map to identify the zone, any heritage overlay, character area, environmental overlay or growth area zone that applies to your block.
Planning permit (if required)
If your project needs a planning permit (most heritage / character-area / larger developments do), lodge with your council. VicSmart is a fast-tracked pathway available for some minor applications.
Appoint a Relevant Building Surveyor (RBS)
The RBS must be appointed by the OWNER (not the builder). Choose either a municipal or private building surveyor. This is a legal requirement in VIC.
Building Permit Number (BPN) via BAMS
Your RBS applies for a 13-digit BPN through the Building Activity Management System (BAMS). Since 26 November 2025 a new formula for the Calculated Cost of Works (CoW) applies. New BAMS reporting fields (including mandatory architect status) took effect 20 March 2026.
Building Permit Levy
Required for works costing over $10,000. Rate: 0.00064 general levy + 0.00064 DBDRV levy of the CoW. Pay via the BPC secure portal (BPAY or card). Your RBS cannot issue the permit until the BPN is received.
Construction, inspections + occupancy
Build proceeds under RBS inspection at prescribed stages. On completion, the RBS issues an Occupancy Permit (or Certificate of Final Inspection for extensions).
These are STATE fees, identical across every Melbourne council. Your council may charge additional planning-permit application fees on top, see per-council notes below.
Heritage and neighbourhood character are the main drivers through Essendon, Moonee Ponds and Ascot Vale, along with activity-centre built-form controls and flooding overlays near the Maribyrnong River. It is an established area, so most projects are knockdown rebuilds or renovations.
If your property is in a Heritage Overlay or a neighbourhood character area, demolition and external alterations usually trigger a planning permit before the building permit. Check VicPlan and confirm with Moonee Valley City Council.
Essendon Fields flight paths. Aircraft noise contours set glazing and insulation specs on streets that look nothing like an airport suburb.
Every council's quirkWe use cookies to improve your experience. Cookies on. Learn more