Monash Council Vic

Victoria · City of Monash

Building in City of Monash

Your Melbourne east-suburban council approval guide

Overview

City of Monash covers Melbourne's established middle-east, Glen Waverley, Mount Waverley, Clayton, Oakleigh, Wheelers Hill, Notting Hill, Chadstone and Ashwood. Heavy Asian-Australian family demand keeps this a premium market for large family homes. Monash has moderate tree protection (established suburban canopy), fewer heritage overlays than inner-Melbourne, and generally faster planning permits than the inner-suburbs.

Suburbs covered

AshwoodBurwoodChadstoneClaytonClayton South (part)Glen WaverleyHuntingdaleHughesdaleMount WaverleyMulgraveNotting HillOakleighOakleigh EastOakleigh SouthWheelers Hill

Local considerations

Significant tree overlay

Monash protects Significant Trees (over 5m tall / 40cm trunk). Arborist assessment required before construction nearby. Removal refused about 55% of the time. Budget $1,200-$3,500 in arborist + application fees. Design typically must move around trees.

Reactive clay east-belt

Monash sits on Melbourne's eastern reactive-clay belt. Expect $8k-$18k extra in engineered piering or waffle-raft footings for slab-on-ground works. Geotech report is non-negotiable.

Premium family-home demand

Glen Waverley, Mount Waverley and Ashwood have some of Melbourne's highest demand for large 4-5 bedroom family homes with 2-storey layouts. Trades and cabinetry lead times run 10-16 weeks vs 8-12 in outer suburbs.

Monash planning permit timeline

5-8 weeks for standard permits. Tree-affected applications: 6-10 weeks. Medium-density (townhouse) applications: 4-6 months.

Building Permit Process (Victoria)

Victoria separates planning permits (about land use, from your council) and building permits (about construction methods, from a Relevant Building Surveyor). You usually need the planning permit FIRST, then the building permit.

  1. Check zoning + overlays

    Use VicPlan (planning-schemes.app.planning.vic.gov.au) or your council's interactive map to identify the zone, any heritage overlay, character area, environmental overlay or growth area zone that applies to your block.

  2. Planning permit (if required)

    If your project needs a planning permit (most heritage / character-area / larger developments do), lodge with your council. VicSmart is a fast-tracked pathway available for some minor applications.

  3. Appoint a Relevant Building Surveyor (RBS)

    The RBS must be appointed by the OWNER (not the builder). Choose either a municipal or private building surveyor. This is a legal requirement in VIC.

  4. Building Permit Number (BPN) via BAMS

    Your RBS applies for a 13-digit BPN through the Building Activity Management System (BAMS). Since 26 November 2025 a new formula for the Calculated Cost of Works (CoW) applies. New BAMS reporting fields (including mandatory architect status) took effect 20 March 2026.

  5. Building Permit Levy

    Required for works costing over $10,000. Rate: 0.00064 general levy + 0.00064 DBDRV levy of the CoW. Pay via the BPC secure portal (BPAY or card). Your RBS cannot issue the permit until the BPN is received.

  6. Construction, inspections + occupancy

    Build proceeds under RBS inspection at prescribed stages. On completion, the RBS issues an Occupancy Permit (or Certificate of Final Inspection for extensions).

State Building Fees (VIC 2026-27)

These are STATE fees, identical across every Melbourne council. Your council may charge additional planning-permit application fees on top, see per-council notes below.

Building Permit Levy, general0.00064 × CoW (works > $10,000)
Building Permit Levy, DBDRV0.00064 × CoW (works > $10,000)
Metropolitan Planning Levy (larger dev only)$1,344,000 threshold (2026-27); pay to SRO
Owner-builder Certificate of Consent (works > $16,000)BPC application; approx. 45 business days processing

Typical Timelines (Melbourne average)

Straightforward planning permit (VicSmart)10 to 30 business days
Standard planning permit (no objections)60 to 90 days
Complex / heritage / notified planning permit3 to 8 months
Building permit (once planning approved)2 to 4 weeks
Owner-builder Certificate of Consent~45 business days

Frequently asked questions

How do I check if my Monash block has a Significant Tree?

Book a Significant Tree assessment via Monash Council ($200-$400) or engage an arborist ($800-$1,500) to survey your block. Any tree over 5m tall / 40cm trunk usually qualifies as Significant and cannot be removed without a council permit. Approval rates for removal (for construction) are around 45%.

Is Glen Waverley harder for planning than outer-Melbourne?

Slightly. Monash averages 5-8 weeks for standard permits vs 3-5 weeks in Wyndham/Melton. Not slow, but not the fastest. Tree impact and medium-density applications add 2-4 months.

Best builders for Glen Waverley 4-5 bedroom family homes?

National volume builders active across Melbourne's established east handle standard project homes well in Monash. Custom demand exceeds capacity - top custom builders run 8-14 month waitlists. BuildPilot is opening in Victoria - join the waitlist and we will contact you first when the Monash-area matcher goes live.