Your Melbourne western-suburbs council approval guide
Brimbank City Council is Melbourne's largest western-suburbs council, covering Sunshine, St Albans, Deer Park, Sydenham, Taylors Lakes, Delahey, Cairnlea, Keilor and Kings Park. It mixes established post-war suburbs ripe for knockdown rebuilds and dual occupancies with newer estate pockets, plus major urban renewal around the Sunshine National Employment and Innovation Cluster.
Rebuild + dual-occ market
Established lots across St Albans, Sunshine and Deer Park suit knockdown rebuilds and dual occupancies; ResCode and the Townhouse and Low-Rise Code apply, with the garden area rule on lots 400sqm and over.
Sunshine urban renewal
Sunshine is a designated priority precinct with activity-centre built-form and height controls; larger and mixed-use projects face discretionary assessment.
Flooding + older land
Low-lying land near Kororoit Creek and the Maribyrnong can carry inundation overlays; some parcels carry legacy industrial considerations. Check VicPlan early.
Victoria separates planning permits (about land use, from your council) and building permits (about construction methods, from a Relevant Building Surveyor). You usually need the planning permit FIRST, then the building permit.
Check zoning + overlays
Use VicPlan (planning-schemes.app.planning.vic.gov.au) or your council's interactive map to identify the zone, any heritage overlay, character area, environmental overlay or growth area zone that applies to your block.
Planning permit (if required)
If your project needs a planning permit (most heritage / character-area / larger developments do), lodge with your council. VicSmart is a fast-tracked pathway available for some minor applications.
Appoint a Relevant Building Surveyor (RBS)
The RBS must be appointed by the OWNER (not the builder). Choose either a municipal or private building surveyor. This is a legal requirement in VIC.
Building Permit Number (BPN) via BAMS
Your RBS applies for a 13-digit BPN through the Building Activity Management System (BAMS). Since 26 November 2025 a new formula for the Calculated Cost of Works (CoW) applies. New BAMS reporting fields (including mandatory architect status) took effect 20 March 2026.
Building Permit Levy
Required for works costing over $10,000. Rate: 0.00064 general levy + 0.00064 DBDRV levy of the CoW. Pay via the BPC secure portal (BPAY or card). Your RBS cannot issue the permit until the BPN is received.
Construction, inspections + occupancy
Build proceeds under RBS inspection at prescribed stages. On completion, the RBS issues an Occupancy Permit (or Certificate of Final Inspection for extensions).
These are STATE fees, identical across every Melbourne council. Your council may charge additional planning-permit application fees on top, see per-council notes below.
Yes. Established suburbs such as St Albans, Sunshine and Deer Park have generous older lots that suit knockdown rebuilds and dual occupancies. Two or more dwellings need a planning permit under Clause 55 and the Townhouse and Low-Rise Code, and the garden area rule applies on lots 400sqm and over.
A single dwelling on a standard lot with no overlay usually needs only a building permit. Dual occupancies, overlays (flooding near Kororoit Creek, heritage) and the Sunshine renewal precinct can trigger a planning permit. Check VicPlan and confirm with Brimbank City Council.
Sunshine's future airport-rail station. Height limits near the station are rising, and the old Harvester Works land comes with a contamination file.