Melbourne renovations are shaped by heritage overlays (40% of inner + middle-ring blocks), long trade waitlists (10-16 weeks in 2026), and sub-floor waterproofing challenges in Victorian and Edwardian character homes. Here is the honest sequence.
$180K - $650K
full renovation - kitchen + 2 bathrooms + flooring + paint
6 - 14 months
design to move-back-in

What this means in practice
Character homes worth preserving
The steps that move the needle. We sit beside you on each one.
Heritage Overlay controls what you can change externally. Internal-only renovations rarely need a planning permit.
$800-$1,500 for a full pre-reno inspection. Cheaper than discovering surprises mid-build.
Internal only = building permit (2-6 wks). Any external change or heritage = planning permit (3-6 months).
Not after demolition. Melbourne cabinetry lead times are 14-20 weeks in 2026 - see our post on the sequencing trap.
Full-home renos usually displace family; single-room renos let you stay. See our whole-home-vs-single-room comparison.
Adelaide-based advisor. No retainer. No upselling. We have walked this exact journey with hundreds of families.