Renovation Melbourne

Journeys/Melbourne Journey

Home Renovation Journey in Melbourne

Melbourne renovations are shaped by heritage overlays (40% of inner + middle-ring blocks), long trade waitlists (10-16 weeks in 2026), and sub-floor waterproofing challenges in Victorian and Edwardian character homes. Here is the honest sequence.

Typical cost

$180K - $650K

full renovation - kitchen + 2 bathrooms + flooring + paint

Typical timeline

6 - 14 months

design to move-back-in

Melbourne home mid-renovation with tradespeople on site

What this means in practice

Character homes worth preserving

Get matched with the right builder for your build

A 3-minute questionnaire on budget, block type and build style. We shortlist Adelaide partner builders that fit, and hand you a comparison table. No pushy calls, no commitment.

  • Under 3 minutes. 8 quick questions, no email required to see results.
  • Ranked shortlist. Match score, price band, and where each builder actually builds.
  • Independent. Editorial layer over paid ranking. Builders can't buy their way to the top.

This journey suits you if

  • Character homes worth preserving
  • Heritage-overlay blocks where KDR is blocked
  • Owners loving location + wanting layout updates

What goes wrong most

  • Hidden asbestos in pre-1985 bathrooms + kitchens ($3k-$18k)
  • Sub-floor waterproofing in period bathrooms ($6k-$14k)
  • Planning permit delays in heritage suburbs (3-6 months)

How it actually unfolds

The steps that move the needle. We sit beside you on each one.

  1. 1

    Overlay check before design

    Heritage Overlay controls what you can change externally. Internal-only renovations rarely need a planning permit.

  2. 2

    Certified inspection for asbestos + termite + structural

    $800-$1,500 for a full pre-reno inspection. Cheaper than discovering surprises mid-build.

  3. 3

    Design + build permit (potentially planning permit)

    Internal only = building permit (2-6 wks). Any external change or heritage = planning permit (3-6 months).

  4. 4

    Order cabinetry the week you sign

    Not after demolition. Melbourne cabinetry lead times are 14-20 weeks in 2026 - see our post on the sequencing trap.

  5. 5

    Build sequence + move back in

    Full-home renos usually displace family; single-room renos let you stay. See our whole-home-vs-single-room comparison.