Granny Flat / Dependent Person's Unit in Melbourne

Melbourne granny flats sit under Victoria's Dependent Person's Unit (DPU) and Secondary Dwelling regulations - more restrictive than SA's 2023 rules. Every granny flat needs a planning permit, must fit Rescode setbacks, and often requires a family relationship for the fast-track pathway. Here is the honest process.

Typical cost

$180K - $420K

1-2 bed granny flat, prepared site, includes services

Typical timeline

8 - 14 months

design to move-in

Melbourne granny flat behind a family home

What this means in practice

Blocks over 500m² without Heritage Overlay

Get matched with the right builder for your build

A 3-minute questionnaire on budget, block type and build style. We shortlist Adelaide partner builders that fit, and hand you a comparison table. No pushy calls, no commitment.

  • Under 3 minutes. 8 quick questions, no email required to see results.
  • Ranked shortlist. Match score, price band, and where each builder actually builds.
  • Independent. Editorial layer over paid ranking. Builders can't buy their way to the top.

This journey suits you if

  • Blocks over 500m² without Heritage Overlay
  • Multi-generational families
  • Owners needing aging-parent solution or teen wing

What goes wrong most

  • Heritage overlays block DPUs entirely in some inner suburbs
  • Rescode site coverage / garden area limits fit on small blocks
  • Separate services connection ($15k-$40k)

How it actually unfolds

The steps that move the needle. We sit beside you on each one.

  1. 1

    Overlay + Rescode check on VicPlan

    Confirm block is over 500m², not Heritage Overlay, and Rescode setbacks + garden area allow a DPU footprint.

  2. 2

    Choose DPU or Secondary Dwelling classification

    DPU = dependent family only, faster permit. Secondary Dwelling = rentable, slower + stricter permit. Pick early - re-classification later needs a new permit.

  3. 3

    Design + planning permit application

    Melbourne DPU planning permit typically 6-14 weeks. Heritage overlay or Yarra/Stonnington/Bayside councils: 3-6 months.

  4. 4

    Building permit + services connection

    Separate power meter, water tie-in, sewer connection. Standard piered footings on Melbourne reactive clay adds $8k-$18k.

  5. 5

    Construction + Occupancy Permit

    5-9 months on-site typically. Detached DPU faster than an integrated addition.