Your northern growth-fringe approval guide
Mitchell Shire sits on Melbourne's northern growth fringe, covering Beveridge, Wallan and Kilmore. The southern part (Beveridge) is an emerging growth front governed by Precinct Structure Plans; the townships and rural areas offer larger country-style lots with environmental and bushfire overlays in places.
Emerging growth front at Beveridge
Beveridge is one of Melbourne's newest growth areas, with PSPs and early estate releases; GAIC can apply to land in the contribution area.
Rural + township lots
Wallan, Kilmore and surrounds offer larger lots; some carry Bushfire Management or environmental overlays that trigger a planning permit. Check VicPlan.
Servicing + access
On rural-residential lots confirm water, power and effluent (septic) and all-weather access early, these shape both cost and siting.
Victoria separates planning permits (about land use, from your council) and building permits (about construction methods, from a Relevant Building Surveyor). You usually need the planning permit FIRST, then the building permit.
Check zoning + overlays
Use VicPlan (planning-schemes.app.planning.vic.gov.au) or your council's interactive map to identify the zone, any heritage overlay, character area, environmental overlay or growth area zone that applies to your block.
Planning permit (if required)
If your project needs a planning permit (most heritage / character-area / larger developments do), lodge with your council. VicSmart is a fast-tracked pathway available for some minor applications.
Appoint a Relevant Building Surveyor (RBS)
The RBS must be appointed by the OWNER (not the builder). Choose either a municipal or private building surveyor. This is a legal requirement in VIC.
Building Permit Number (BPN) via BAMS
Your RBS applies for a 13-digit BPN through the Building Activity Management System (BAMS). Since 26 November 2025 a new formula for the Calculated Cost of Works (CoW) applies. New BAMS reporting fields (including mandatory architect status) took effect 20 March 2026.
Building Permit Levy
Required for works costing over $10,000. Rate: 0.00064 general levy + 0.00064 DBDRV levy of the CoW. Pay via the BPC secure portal (BPAY or card). Your RBS cannot issue the permit until the BPN is received.
Construction, inspections + occupancy
Build proceeds under RBS inspection at prescribed stages. On completion, the RBS issues an Occupancy Permit (or Certificate of Final Inspection for extensions).
These are STATE fees, identical across every Melbourne council. Your council may charge additional planning-permit application fees on top, see per-council notes below.
Beveridge offers some of the most affordable land on Melbourne's northern fringe, but as an emerging growth area, amenity and title registration can lag. Confirm the estate's title timeline and nearby services before committing.
Rural and township lots in Mitchell can carry Bushfire Management, environmental significance or other overlays that trigger a planning permit before the building permit. Always check the parcel on VicPlan and confirm with Mitchell Shire.
We use cookies to improve your experience. Cookies on. Learn more