Overview

Mitchell Shire sits on Melbourne's northern edge along the Hume Freeway, covering Beveridge, Wallan, Kilmore, Broadford and Seymour. The shire's southern end (Beveridge and Wallan) is one of Melbourne's designated growth corridors with major master-planned house and land, while the northern townships are more semi-rural. It blends Melbourne growth-area development with rural and some bushfire-prone land further north.

Suburbs covered

BeveridgeWallanKilmoreBroadfordSeymourWandongHeathcote JunctionTallarook

Building in these suburbs

Local considerations

Beveridge / Wallan growth corridor

Beveridge and Wallan are within Melbourne's Urban Growth Boundary with Precinct Structure Plans and growth-area infrastructure contributions (GAIC may apply). Titled estate lots usually need only a building permit plus estate design approval.

Rural and bushfire land

Townships like Kilmore, Broadford and Wandong include rural-living and bushfire-prone land; a Bushfire Management Overlay can trigger a BAL assessment and planning permit. Check VicPlan.

Semi-rural servicing

Outside the growth corridor, lots may rely on tank water or septic and have minimum dwelling and subdivision controls, so confirm servicing before you buy.

Building Permit Process (Victoria)

Victoria separates planning permits (about land use, from your council) and building permits (about construction methods, from a Relevant Building Surveyor). You usually need the planning permit FIRST, then the building permit.

  1. Check zoning + overlays

    Use VicPlan (planning-schemes.app.planning.vic.gov.au) or your council's interactive map to identify the zone, any heritage overlay, character area, environmental overlay or growth area zone that applies to your block.

  2. Planning permit (if required)

    If your project needs a planning permit (most heritage / character-area / larger developments do), lodge with your council. VicSmart is a fast-tracked pathway available for some minor applications.

  3. Appoint a Relevant Building Surveyor (RBS)

    The RBS must be appointed by the OWNER (not the builder). Choose either a municipal or private building surveyor. This is a legal requirement in VIC.

  4. Building Permit Number (BPN) via BAMS

    Your RBS applies for a 13-digit BPN through the Building Activity Management System (BAMS). Since 26 November 2025 a new formula for the Calculated Cost of Works (CoW) applies. New BAMS reporting fields (including mandatory architect status) took effect 20 March 2026.

  5. Building Permit Levy

    Required for works costing over $10,000. Rate: 0.00064 general levy + 0.00064 DBDRV levy of the CoW. Pay via the BPC secure portal (BPAY or card). Your RBS cannot issue the permit until the BPN is received.

  6. Construction, inspections + occupancy

    Build proceeds under RBS inspection at prescribed stages. On completion, the RBS issues an Occupancy Permit (or Certificate of Final Inspection for extensions).

State Building Fees (VIC 2026-27)

These are STATE fees, identical across every Melbourne council. Your council may charge additional planning-permit application fees on top, see per-council notes below.

Building Permit Levy, general0.00064 × CoW (works > $10,000)
Building Permit Levy, DBDRV0.00064 × CoW (works > $10,000)
Metropolitan Planning Levy (larger dev only)$1,344,000 threshold (2026-27); pay to SRO
Owner-builder Certificate of Consent (works > $16,000)BPC application; approx. 45 business days processing

Typical Timelines (Melbourne average)

Straightforward planning permit (VicSmart)10 to 30 business days
Standard planning permit (no objections)60 to 90 days
Complex / heritage / notified planning permit3 to 8 months
Building permit (once planning approved)2 to 4 weeks
Owner-builder Certificate of Consent~45 business days

Frequently asked questions

Is Mitchell Shire part of Melbourne's growth corridor?

The southern end is. Beveridge and Wallan sit within Melbourne's Urban Growth Boundary and are major northern growth areas with master-planned house and land. Further north, Kilmore, Broadford and Seymour are more semi-rural townships.

Do I need a planning permit to build in Mitchell Shire?

On a titled estate lot in the growth corridor with no overlay, a single dwelling usually needs only a building permit plus estate design approval. Rural-living and bushfire-prone land (common in the northern townships) can trigger a planning permit and BAL assessment. Check VicPlan and confirm with Mitchell Shire Council.