Victoria · City of Kingston
Your Melbourne bayside southeast council approval guide
City of Kingston covers Melbourne's southeast coast, Mordialloc, Aspendale, Chelsea, Bonbeach, Cheltenham, Mentone, Parkdale, Moorabbin and Highett. Two forces dominate: bay-facing coastal overlays (salt air, storm surge, foreshore controls) and Neighbourhood Character policy that restricts front-facade appearance across most residential streets. Kingston is quieter than Bayside on heritage but similar on character.
Coastal salt-air exposure
Homes within 2km of Port Phillip Bay in Mordialloc, Aspendale, Chelsea, Bonbeach and Parkdale face significant salt corrosion. Insist on marine-grade (316) stainless fixings, Colorbond Ultra roofing and epoxy-coated pump housings for any water feature. Adds 5-10% to build cost.
Neighbourhood Character policy
Most Kingston residential streets sit under a Neighbourhood Character Overlay that controls front facade, roof pitch, materials palette and setbacks. Not as strict as Bayside heritage but adds 4-8 weeks to planning permit and $2,500-$6,000 in architectural consultancy.
Land Subject to Inundation Overlay (LSIO)
Low-lying pockets of Aspendale, Chelsea, Bonbeach and Patterson Lakes sit under an LSIO - flood-prone land. New builds need floor-level above the LSIO threshold (usually 2.6-3.2m AHD). Check the overlay + threshold on VicPlan BEFORE contract. Adds $20,000-$60,000 in fill/footing engineering.
Kingston planning permit timeline
2-5 months for standard planning permits. Character overlay + coastal: 3-6 months. LSIO-referred applications: 4-8 months. Faster than inner-Melbourne councils but slower than growth corridors.
Victoria separates planning permits (about land use, from your council) and building permits (about construction methods, from a Relevant Building Surveyor). You usually need the planning permit FIRST, then the building permit.
Check zoning + overlays
Use VicPlan (planning-schemes.app.planning.vic.gov.au) or your council's interactive map to identify the zone, any heritage overlay, character area, environmental overlay or growth area zone that applies to your block.
Planning permit (if required)
If your project needs a planning permit (most heritage / character-area / larger developments do), lodge with your council. VicSmart is a fast-tracked pathway available for some minor applications.
Appoint a Relevant Building Surveyor (RBS)
The RBS must be appointed by the OWNER (not the builder). Choose either a municipal or private building surveyor. This is a legal requirement in VIC.
Building Permit Number (BPN) via BAMS
Your RBS applies for a 13-digit BPN through the Building Activity Management System (BAMS). Since 26 November 2025 a new formula for the Calculated Cost of Works (CoW) applies. New BAMS reporting fields (including mandatory architect status) took effect 20 March 2026.
Building Permit Levy
Required for works costing over $10,000. Rate: 0.00064 general levy + 0.00064 DBDRV levy of the CoW. Pay via the BPC secure portal (BPAY or card). Your RBS cannot issue the permit until the BPN is received.
Construction, inspections + occupancy
Build proceeds under RBS inspection at prescribed stages. On completion, the RBS issues an Occupancy Permit (or Certificate of Final Inspection for extensions).
These are STATE fees, identical across every Melbourne council. Your council may charge additional planning-permit application fees on top, see per-council notes below.
Check VicPlan (mapshare.vic.gov.au) for Land Subject to Inundation Overlay (LSIO) or Special Building Overlay (SBO). Low-lying Aspendale, Chelsea, Bonbeach and parts of Patterson Lakes are covered. LSIO blocks need floor-level above the flood threshold (adds $20k-$60k in fill / raised footings). Confirm the exact threshold with Kingston Council before signing.
Most residential streets have a Neighbourhood Character Overlay setting front-facade materials, roof pitch and setback expectations. Applications outside these expectations get bounced. Council prefers pitched roofs, weatherboard or brick veneer, front-verandah presentation. Budget $2,500-$6,000 in architect/planner consultancy to get through.
Standard: 2-5 months. With character overlay + coastal: 3-6 months. With LSIO referral: 4-8 months. Faster than inner-Melbourne, slower than Wyndham/Melton. Pre-application meetings help.
We use cookies to improve your experience. Cookies on. Learn more