How to hire a quantity surveyor in Adelaide

Quantity surveyors bring cost certainty to residential projects. Here are the five different reports a QS provides, how their fees work, and which report is right for your situation.

George Giannakakis, Founder, BuildPilot
By George Giannakakis · Founder
B.Arch.Studies · M.Arch (UniSA) · RLA300580 · Reviewed
Email me the printable
Quick answer

Quantity surveyors bring cost certainty to residential projects. Here are the five different reports a QS provides, how their fees work, and which report is right for your situation.

The 10-step framework

  1. STEP 1

    Understand the five main QS reports

    Pre-construction cost estimate: independent budget check before signing a builder contract. Bill of Quantities: itemised cost breakdown used in tenders. Insurance replacement estimate: for insurance sum insured accuracy. Tax depreciation schedule: for investor properties. Progress claim valuation: for dispute resolution during construction. Each is a different scope and fee.

  2. STEP 2

    Confirm the QS is qualified (RICS or AIQS)

    Qualified quantity surveyors hold either RICS (Royal Institution of Chartered Surveyors) or AIQS (Australian Institute of Quantity Surveyors) accreditation. Both signal formal training and adherence to professional standards. Non-accredited providers can be excellent but the credentialing is a useful quality filter.

  3. STEP 3

    Get a pre-construction estimate before signing a contract

    For any build over a few hundred thousand dollars, an independent pre-construction estimate from a QS is a small investment against a large commitment. The QS reviews the builder contract, drawings, and specification, and provides an independent view on whether the contract price is realistic. This often surfaces provisional sum concerns before contract signing.

  4. STEP 4

    Consider depreciation schedules for investment properties

    For a new investment property in Adelaide, a QS depreciation schedule provides an itemised list of depreciable assets and their values. This drives significant tax benefits for investors. The QS fee is typically deductible in year one and delivers many multiples of the fee in tax benefits over the property life.

  5. STEP 5

    Compare fee structures fairly

    QS fees fall into three patterns: fixed fee (for defined scopes like depreciation schedules), percentage of construction value (for large projects with ongoing scope), or hourly (for advisory scopes). For most residential engagements, fixed fee on defined scope is the norm.

  6. STEP 6

    Discuss the scope of a Bill of Quantities

    A Bill of Quantities itemises every measurable material and labour input for a build. It is used to standardise builder tenders (every builder prices the same list) and gives the client comparable quotes. BoQ preparation adds cost but often more than pays for itself in tender clarity.

  7. STEP 7

    Understand progress claim valuation

    If a builder progress claim seems out of step with actual site progress, a QS can perform an independent valuation. This is protective for the client and provides evidence in any dispute. Not required on every build but valuable when disputes arise.

  8. STEP 8

    Confirm insurance replacement value periodically

    For an existing home, insurance sum insured should reflect current replacement cost, not original purchase price or market value. A QS insurance replacement estimate ensures the home is properly insured. Fees are modest and every 3-5 years is a reasonable review cycle.

  9. STEP 9

    Verify professional indemnity insurance

    Qualified QSs are typically required to hold PI insurance under their institute rules. Ask for a certificate of currency.

  10. STEP 10

    Discuss the interaction with the builder

    Some builders welcome QS involvement (transparent tender, disciplined progress claims). Others resist it. A builder who resists independent QS scrutiny is often signalling something. Take note.

Printable

Want this as a printable?

We'll email you the full 10-step framework, formatted for printing and ready to take into your next site visit or quote meeting.

FAQs

For any project over several hundred thousand dollars, an independent pre-construction estimate provides a valuable second view. It confirms the contract price is realistic, surfaces provisional sum concerns, and gives you an independent baseline if disputes arise later.