Town Planners Melbourne

Town Planners in Melbourne: Getting a Permit Approved

A building permit is not the same as a planning permit. Many Melbourne sites, especially established suburbs and anything with an overlay, need a planning permit first, and a town planner is who gets it through council.

George Giannakakis, Founder, BuildPilot
By George Giannakakis · Founder
B.Arch.Studies · M.Arch (UniSA) · RLA300580 · Reviewed
Dual occupancy in Melbourne
Building in Adelaide? See our Adelaide town planners guide

Gets you

Planning permit

before building permit

Fast track

VicSmart

for simple applications

Rules

ResCode

residential standards

Appeals

VCAT

if refused or objected

Planning permit vs building permit

A planning permit is council approval that you can use the land for what you propose, assessed against the planning scheme, ResCode and any overlays. A building permit, issued later by a building surveyor, is approval that the construction meets the building code. Many Melbourne projects need both, in that order.

A single new home on a standard block in a growth corridor often needs no planning permit. But established suburbs, dual occupancies, subdivisions, and any block with an overlay usually do, and that is where a planner earns their fee.

Overlays and ResCode

Melbourne blocks frequently carry overlays: Heritage, Bushfire Management (BMO), Significant Landscape, Special Building, or flood-related overlays. Each adds requirements and can trigger a planning permit even for works that would otherwise be exempt. A planner identifies what applies and designs the application to satisfy it.

For residential development, the planner tests the proposal against ResCode (the state residential development standards) on matters like setbacks, overlooking, overshadowing and garden area, and shapes the design so it meets them before lodgement.

Objections, VicSmart and VCAT

Straightforward proposals may qualify for VicSmart, a faster assessment track with set timeframes and no public notice. More complex applications can attract objections from neighbours, which the planner helps you respond to, and if council refuses or imposes conditions you disagree with, the matter can go to VCAT.

Engaging a planner early, before design locks in, is the single biggest thing that keeps a tricky Melbourne site on track. BuildPilot does not provide planning services; we help you find an experienced town planner.

Why You Should Visit the 2026 Melbourne Home Show This Weekend
22m 07s
Watch: same topic on Home Building HubSponsored byHome Building Hub
Why You Should Visit the 2026 Melbourne Home Show This Weekend

The Melbourne Home Show is on this weekend - and if you’re building, renovating, or just exploring ideas, it’s one event worth your time. We sit down with Exhibition Director Regan Hudson to break down what to expect, what not to miss, and how to get real value from your visit.

Watch full episode

Frequently asked

Do I need a planning permit to build a house in Melbourne?+

Often not for a single new home on a standard block in a growth corridor. But established suburbs, dual occupancies, subdivisions and any block with an overlay usually require a planning permit before you can get a building permit.

What is the difference between a planning permit and a building permit?+

A planning permit is council approval for the proposed use and development against the planning scheme and ResCode. A building permit, issued later by a building surveyor, approves the construction against the building code. Many projects need both, planning first.

What is VicSmart?+

A streamlined planning permit process for simpler applications, with set assessment timeframes and generally no public notice or objections. A planner can tell you whether your proposal qualifies.

What happens if council refuses my application?+

You can apply to the Victorian Civil and Administrative Tribunal (VCAT) to review the decision. A town planner helps prepare and present the case, which is why getting the application right first time is far cheaper.

Building in Adelaide instead?

See our Adelaide town planners guide

Compare the options

The material and system choices that move your Melbourne build budget most, weighed up in plain English for Victoria.

Sources

Last verified June 2026
  • Victorian Government, planning permits link
  • VicSmart applications link
  • Victorian Civil and Administrative Tribunal (VCAT) link

Cost ranges are planning estimates cross-checked against the sources above, not quotes. Prices move with materials, labour, site conditions and council rules. Always confirm against a written, fixed-price quote for your own block.

Ask this before you sign, Victoria

Six questions that save the most money

  1. 1
    Is your VBA registration current, and what class?

    DB-U for unlimited domestic work. Check it on the VBA register and the disciplinary register.

  2. 2
    Show me the Domestic Building Insurance certificate for my job.

    DBI is mandatory before more than a 5% deposit. No certificate, no deposit.

  3. 3
    What soil class is my block and is the slab priced for it?

    Basalt clay in the west is Class H to E. A "standard" site allowance is a variation waiting to happen.

  4. 4
    Is the site-cost allowance fixed or provisional?

    Provisional means you pay the difference. Ask for it fixed after the soil test and survey.

  5. 5
    Is the house all-electric, and what is the induction and heat-pump spec?

    No new gas connections in Victoria since 2024.

  6. 6
    Which benchtop material replaces engineered stone?

    Banned since July 2024. Porcelain, natural stone or laminate.

Found this useful? Make BuildPilot a preferred source so our guides show up more often in your Google feed.

Cookies on. Learn more