Bushfire Attack Level (BAL): What Outer-Melbourne Buyers Must Know

Bushfire Attack Level (BAL): What Outer-Melbourne Buyers Must Know

By , Editor and Founder, BuildPilot. M.Arch, Licensed Real Estate Agent (RLA300580), HIA Industry Judge. Last reviewed: .

Bushland home in the Yarra Ranges

Bushfire Attack Level (BAL): What Outer-Melbourne Buyers Must Know

Planning + Permits5 min
All articles

Heads up

This article is written for readers in Victoria. Rules, prices and builders referenced apply to Victoria only — you're currently viewing BuildPilot as a South Australia visitor. Read it for context, but check South Australia-specific sources before acting on any figures.

George Giannakakis

By George Giannakakis · B.Arch.Studies · M.Arch (UniSA) · RLA300580

Last reviewed: · How we research

If your block sits within a Bushfire Management Overlay (BMO), you cannot get a building permit without a Bushfire Attack Level (BAL) assessment - the certified rating that determines what materials your builder can use. Yarra Ranges, Mornington Peninsula hinterland, Cardinia, Nillumbik, and much of outer-east Melbourne routinely require BAL-compliant construction. Here is what BAL actually means in practical terms.

The six BAL ratings

  • BAL-LOW: Insufficient bushfire risk to warrant specific construction requirements.
  • BAL-12.5: Ember attack. Standard hardwoods allowed, ember-resistant mesh required over any gaps.
  • BAL-19: Ember attack + increasing heat flux. Fire-retardant treated timbers or non-combustible cladding required.
  • BAL-29: Ember attack + heat flux to 29 kW/m2 + short flame contact. Only fire-retardant treated hardwoods or specific BAL-rated composite brands allowed for decking.
  • BAL-40: Higher heat flux + longer flame contact. Non-combustible cladding mandatory throughout.
  • BAL-FZ (Flame Zone): Direct flame contact. Non-combustible construction throughout, hardened glazing, ember-resistant everything.

How to check your block's BAL rating

Step 1: Check VicPlan (mapshare.vic.gov.au) with the Bushfire layer toggled - shows BMO coverage. Step 2: If your block is in a BMO, engage a certified BAL assessor - the assessment considers vegetation type, slope and aspect. Cost $650-$1,800. The BAL certificate stays with the property and is used for any future building work.

What the higher ratings cost

BAL-12.5 adds 5-10% to a build cost. BAL-19 adds 15-25%. BAL-29 adds 25-40%. BAL-40 adds 40-70%. BAL-FZ adds 60-100%+. If your block is BAL-29 or higher, confirm the numbers with your builder BEFORE signing anything - some builders quote a base price expecting BAL-12.5 and add BAL-19 upgrades as variations.

Materials that get restricted

  • Decking: Fire-retardant treated hardwoods (spotted gum, blackbutt) at BAL-19; specific BAL-rated composites (Trex, ArmadilloDeck, Modwood BAL-19) at BAL-29+.
  • Cladding: Fibre-cement, brick or steel from BAL-29 up. Timber weatherboard usually rejected past BAL-19.
  • Eaves: Must be sealed at BAL-19+. No open soffit vents at BAL-29+.
  • Windows: Toughened / laminated glass at BAL-29+.
  • Roofing: Colorbond, tile or metal from BAL-12.5 up. Timber shingles never permitted in a BMO.

Where BuildPilot fits

We are not a BAL assessor. Our Mornington verandah guide and Melbourne verandah pillar walk through the practical construction cost impact by BAL rating. If you are looking at a BMO block, get the BAL rating BEFORE quoting any build.

Share this article

Need Expert Building Advice?

BuildPilot provides independent guidance throughout your entire building journey in Adelaide and South Australia.

Get in Touch

Cookies on. Learn more